TFC Jet Pump installation reduces annual workover cost of a deviated beam pumping Frio well while increasing oil production and profitability.
A Galveston, Texas, area Frio formation well being produced by rod pump was facing operational and wellbore limitation issues. The well was completed with 5.5” casing to a depth of 6800’. Due to severe deviation, the operator was faced with 140,000 of average annual pulling and equipment replacement cost.
To eliminate the need for workovers while increasing hydrocarbon production utilizing similar horse power.
A TFC jet pump system was installed at 80% of the cost of the existing beam pump and down hole equipment. The client had previously been using a rail car separator with a suction leg installed for the triplex surface pump’s suction, eliminating the need to purchase any further separation equipment.